PROJECT SPOTLIGHTS
thescottdetroit
- A personal favorite, 199 units, 211,000 square foot, enclosed parking garage with COdetection/evacuation.
- Located in Mid-Town Detroit, this was completed on time with a near impossible deadline.
- Our first of many to come projects with Sachse construction.
GC: Sachse Construction, 3663 Woodward Ave #5, 500, Detroit MI 48201
https://sachseconstruction.com/
Reference: Lou Goldhaber, Chief of Staff 773-329-3103
The Hamilton Midtown
The Hamilton Midtown
- Design-assist beauty on a historical building. We designed VRF for the entire building for its ease of installation in the existing structure.
- Located in Mid-Town Detroit, this was completed on time with NO CHANGE ORDERS!
- Another Sachse construction project.
GC: Sachse Construction, 3663 Woodward Ave #5, 500, Detroit MI 48201
https://sachseconstruction.com/
Reference: Mark Andonian, Project Manager
LCA’s Henry West Parking Structure
LCA’s Henry West Parking Structure
- 128 W. Fischer Service Dr, Detroit MI 48201
- Stairwell and Elevator Pressurization systems as well as Heat Pump systems
- Olympia Development project: https://locations.olympiaparking.com/uwm-garagec7918adc1a51
- LCA’s Henry West Parking Structure was completed with Colasanti-Mig joint venture
- Air King was Project Specific Union Labor Contract on this project
COTS PETERBORO
COTS PETERBORO
- 26 Peterboro, Detroit MI 48201 , completed September 2021
- Coalition for Temporary Services Historical Rehab in Midtown Detroit
- 10 stories 64 Living Units Heat Pump Vertical Stack VRF; Rooftop ERV service living and common; Stairwell Pressurization; Common Space Offices, Lobby HVAC by VAV operated RTUs
Reference: Eric Roach, PM Obrien Construction 586-707-3742
COTS PETERBORO
COTS PETERBORO
- 26 Peterboro, Detroit MI 48201 , completed September 2021
- Coalition for Temporary Services Historical Rehab in Midtown Detroit
- 10 stories 64 Living Units Heat Pump Vertical Stack VRF; Rooftop ERV service living and common; Stairwell Pressurization; Common Space Offices, Lobby HVAC by VAV operated RTUs
Reference: Eric Roach, PM Obrien Construction 586-707-3742
City Modern A1, A2, A6, Hybrids
City Modern A1, A2, A6, Hybrids
- Dan Gilbert’s Bedrock built 6 large multifamily buildings in Midtown Detroit; The Air King provided the mechanical trade on 3 of 6 of the larger buildings and several smaller buildings in the city modern project
- All their buildings were VRF as basis of mechanical design. The equipment was Daikin and LG
- New construction mixed-use retail and multifamily apartments in Brush Park 6 Stories 200,000+ Sq Ft – 200+ Living Units 1 to 1 Vertical Ducted Heat Pumps; (2) Central ERV for Living, Common, and Retail; Stairwell and Elevator shaft Pressurization; Common Space Horizontal Ducted Fan Coils with Heat Pump Condensers.
- Brush Park A6 - Brush Park A1 - Brush Park A2
GC: Sachse Construction, 3663 Woodward Ave #5, 500, Detroit MI 48201
https://sachseconstruction.com/
Reference: Brad Brown, Site Superintendent 313-4954766
The Standard Ann Arbor
The Standard Ann Arbor
- The Standard- 405 S Main St, Ann Arbor MI 48104
- New Construction 485 bed Student Housing Development including Retail and Parking Garage
- 11 Stories 202,292 sq ft 262 rental units with 2 story underground parking
- 262 Ducted VTAC for Living Spaces; 22 Heat Pump Electric Furnaces in Common Spaces; Gas Fired Unit Heaters, CO/NOX Detection and Industrial Blowers in Parking Garage; Stairwell Pressurization; 2 Boilers and full Snowmelt System for patio deck and parking garage.
GC: Landmark Urban Construction, Athens GA
www.landmarkproperties.com/construction/
Reference: Patrick Fitzgerald-PM (678) 920-0489
Completion: August 2022
Beekman On Broadway
Beekman On Broadway
- This 7-story, 256-unit multifamily project was completed August 2021
- The project was started behind schedule with a strict move-in date for students returning to school.
- 11 Stories 202,292 sq ft 262 rental units with 2 story underground parking
- Broadway 1200 was constructed by Rockford Construction and owned by Morningside
Reference: Our Team | Morningside USA Senior project manager-Tom Cahill
Completion: August 2021
Tru by Hilton Troy Detroit
Tru by Hilton Troy Detroit
- This 5-story, 140 unit hotel was completed summer of 2021
- TRU Hotel in Troy – 57,265 Sq Ft, 124 Hotel Rooms, Lobby, Offices, Pool and Amenities
- VRF Heat Recovery on roof serving ducted fan coils in Hotel rooms; Central ERV serving common and Hotel rooms, Makeup Air Unit and Rooftop Unit, split systems for 1st Floor Amenities
Reference: Roger Cannon, Site Superintendent 248-417-3446
Anthology Senior Living
Anthology Senior Living
- 30637 West 14 Mile Rd, Farmington Hills MI
- 78,000 sq ft, 3 Story Assisted Living and Memory Care, with Commercial Kitchen and Amenities completed in September 2021
- GC: Brinkmann Constructors, St Louis https://brinkmannconstructors.com/
Reference: Neil Wiaranowski, Project Engineer 636-537-9700
Gabriel Houz
Gabriel Houz
Historical Rehab in Downtown Detroit https://www.houzeliving.com/apartment-details/GabrielHouze_LN6.html
11 Stories 113 Residential Units 112,825 Sq Ft – Multi Port Ductless Heat Pumps for Residential Spaces; 2 Rooftop DOAS for residential and Common spaces; Central Rooftop Exhaust Fans; Retail and Common Space by 1 to 1 Heat Pump Ducted Fan Coils
GC: Eagle Construction Co 3075 West Grand Blvd. Detroit, MI 48202 http://eaglecllc.com
Reference: Joe Barbat, Owner 248-789-7789
Westwood Inn Senior Living
Westwood Inn Senior Living
Macomb https://westwoodinnseniorliving.com/
New Construction 80 Assisted Living and 38 Memory Care units – 3 stories 120,570 sq ft
Mix RTUs, Furnace / Condenser, Magic Pak, and PTAC units, including Commercial Kitchen
GC: Sachse Construction, 3663 Woodward Ave #5, 500, Detroit MI 48201
https://sachseconstruction.com/
Reference: Kathy Sulik, PM 248-924-5349
4 Corners
4 Corners
White Lake Condominiums https://www.4cornerslakeside.com/
New Construction 108 Apartment Units, Amenities, Retail and Parking Garage
Magic Paks serving Residential Units; RTU, Makeup Air, CO/NOX Gas Detection system for common and parking
Industry Detroit
Industry Detroit
950 Selden St, Detroit MI 48201 https://www.industryoffice.com/detroit
GC: Makers Line, Salt Lake City, UT https://www.makersline.com/
- Historical Rehab Flex Office space – Full ducted VRF and ERV project
- 3-Stories 118,351 Sq Ft
- VRF 128 Duct Fan Coils Heat Recovery Condensers; 8 ERV units; 16 Rooftop Units; Project consists of all exposed Spiral Finish
The Met at Ann Arbor
The Met at Ann Arbor
616 Washington St, Ann Arbor MI 48104 https://rew-online.com/landmark-properties-announcesdevelopment-of-the-legacy-at-ann-arbor-a-two-building-residential-community-in-downtown-ann-arbor/
GC: Landmark Urban Construction, Athens GA www.landmarkproperties.com/
- 19-Story High Rise – 333,275 sq ft 521 Beds 253 Apartments with 5 story Parking Garage and Retail
- New Construction Student Housing Downtown Development - Heat Pump Fan Coil and Condenser Split System; Stairwell Pressurization; Boiler and Snowmelt system for rooftop patio and parking garage.
The Brooke on Bagley
The Brooke on Bagley
Bagley and 16th, Detroit MI https://detroit.urbanize.city/post/southwest-detroit-development-nabs-stateand-brownfield-funding
GC: Sachse Construction, 3663 Woodward, Detroit MI 48201 https://sachseconstruction.com/
- New Construction 78 Unit Mixed Use living and Retail.
- Ductless Split Heat Pump design; Central DOAS for living space and Common.
Broadway 1100 – (The Beekman 2)
1100 Broadway, Ann Arbor MI 48104
GC: Morningside USA 223 West Erie St., Third Floor | Chicago, IL 60654 Office
www.MorningsideUSA.com Reference: Tom Cahill, Senior Project Manager
- New Construction 286 Unit Mixed Use living and Retail;
- VRF and Rooftops for Common and Retail, Magic Paks serving Living units;
What we Bring to the Table
15 successfully completed multifamily projects in the downtown Detroit area in fewer than 6 years.
Over 30 successfully completed multifamily projects statewide.
- We know multifamily construction
- Sequences
- Shafts
- Coordination
- Safety
- Simply put, we bring experience and professionalism
Nearly 40 years of operating in the city of Detroit
- Inspections, Inspectors, The building department
- The city and its inspectors can be a challenge. Thru our decades of work history in the city, we know what our inspectors want.
- We have positive working relationships with our inspectors.
- We have good contacts in the administrative offices
A certified Detroit Based Business.
An Owner that is intricately involved
15 successfully completed multifamily projects in the downtown Detroit area in fewer than 6 years.
- Air King owner Kahlil Assad focuses his time in the field, ensuring quick solutions as problems arise, inspecting works to maintain consistent quality and passed inspections, reinforcing our efficiency procedures set in place to streamline our labor forces’ installation methods.
- Air King traditionally self-performs all our work; in some circumstances we may strategically partner with a fellow expert in the field. Our priority is to provide our customer the highest quality installation in the timeliest manner.
Partnerships with Union outfits.
Nearly 40 years of operating in the city of Detroit
- Inspections, Inspectors, The building department
- The city and its inspectors can be a challenge. Thru our decades of work history in the city, we know what our inspectors want.
- We have positive working relationships with our inspectors.
- We have good contacts in the administrative offices
A certified Detroit Based Business.
GET TO KNOW THE “TEAM”
- Founded in 1984, with nearly 40 years of multi-generational experience
- A Certified Detroit Based Business
- State Licensed in Michigan
- 15 completed multifamily urban projects in downtown Detroit and more than 30 multifamily jobs in all!
- Many employees have worked for our team for more than a decade!
- Currently 50+ field technicians
- 3 Project Managers
- 5 Foreman
Commercial New Construction
Executive Summary
Thru transitions over nearly four decades of being in business, Air King has established a niche in the multifamily construction industry.
- 15 completed multifamily urban projects in downtown Detroit and Over 30 multifamily projects exceeding 5 million square feet completed since 2015.
- Averaged ~900 multifamily units annually
- Averaged ~900,000 square feet of construction annually.
- Bonding Capacity of 15M
- Frequently working side by side with union outfits (including GSI electric, John E Green, Conti and many others)
- 50+ Field Technicians
- Partnering capability with Fellow industry experts when necessary (Union and nonunion)
We have the Experience and relationships to continuously be successful.
- Opportunity:
- Mission:
- Solution orientated:
- Competitive advantage:
As design build and V.E. experts, we find value opportunity where others don’t.
Air King strives to offer incredible quality at an exceptional value
Frequently complications arise in construction and Air King presents every problem with a solution
Experience has grown us; relationships have lifted us; and proper execution has led to our joint successes